Laserfiche WebLink
. ,~,r <br />ROBERTS QUARRY FLOATING BOND <br />In the first five years of operation the total area disturbed at. <br />any one time will be: <br />Major: Stripping and removal of limestone <br />areas 1,2,3,4,8,9 and 'y10 46.0 acres <br />Roads, stockpile and crushing area 8.5 acres <br />Moderate: 0 <br />Minor: 0 <br />Total 54.5 acres <br />Cost of Reclamation: <br />Backfilling - $483.00 <br />Grading & Contouring - 242.00 <br />Seeding & Revegetation- 66.00 <br />$791.00/acre <br />III IIIIIIIIIIIII III <br />999 <br />Major disturbance: <br />Stripping & removal of limestone <br />46.0 acres @ $791.00 = $36,386.00 <br />Roads, stockpile & crushing area <br />8.5 @ $308.00 = 2,618.00 <br />Moderate disturbance: 0 <br />Minor disturbance: 0 <br />$39,004.00 <br />It is requested that a floating bond be required to cover reclam;ition <br />which can be reviewed and adjusted on a periodic basis. <br /> <br />~~.~~ 1 ~ ~s,a <br />r.. _.. - ,.. _ .., ~;;.~ <br /> <br />