Laserfiche WebLink
.. ~ ~, <br />/ ~ , <br />~ Resources, Inc. s ss,~ ~b~ ~~~. P <br />RECEIVED <br />~L 14 20D6 <br />July 10, 2006 ~visien of Minerals end Geology <br />Glenda Williams <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />IN THE MATTER OF BENSON BROTI~RS' SECTION 112 RECLAMATIgN <br />PERMIT APPLICATION, OVER OBJECTIONS, FILE NO. M-2005-071 / <br />Dear Ms. Williams: <br />We are subalitting a Motion for Clarification to the Board Order for the application <br />referred to above. The Order states that "ground vibration monitoring at the project site <br />shall continue for 30 days unless monitoring shows vibrations that could result in offsite <br />damages." From our discussions with Allen Sorenson of the DMG, it was our <br />~~lerst~+_ ~+n_g that monitoring would occur during a 30 day period at the beginning of <br />quarry ripping and/or rock crushing operations and that this monitoring would be <br />discontinued when enough data was collected to satisfy DMG staff that no potentially <br />problematic vibrations are being detected. Mr. Sorenson and Mr. Gordon Revey of <br />Revey Associates, Inc. agree(! that the monitoring need only continue long enough for <br />adequate data to be collected and the additional expense of monitoiing continuously for <br />30 days would not be necessary unless the monitoring shows potentially problematic <br />vibrations. On behalf of Benson Brothers, we are requesting clarification ofthis <br />condition of the Order. <br />Thank you for your assistance. <br />Sincerely, ~ <br />~~~~~?~~ <br />Michael L. Ripp <br />Consultant <br />P.O. Box 54 • Delta, CO 81416 <br />(970) 874.5127 • Fax: (970) 874.3161 • e-mail: mvripp®aoLcom <br />