Laserfiche WebLink
4.23 <br />• water surface elevation should the overland flow occur. The construction of the parking lot will <br />entail the creation of a flat surface dipping toward the haul road. The two feet of embankment <br />necessary to create water flow towards the sedimentation structures will lift the parking lot out <br />of the 100 year flood plain and re •divert the flows towards East Salt Creek. Therefore, there <br />will be no risk to human safety, health and welfare. Natural and beneficial flood plain values will <br />be recreated when the area is returned to AOC during reclamation. <br />• <br /> <br />Mu Volume VI 1 - 22 - 96 <br />