My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102235
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:12 PM
Creation date
11/24/2007 8:38:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 17 STIPULATION RESPONSES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12-16-85 <br />PEERLESS RESOURCES, INC. <br />• STIPULATION RESPONSES <br />Stipulation No. 1 <br />Prior to permit issuance, the applicant shall update, rewrite and <br />incorporate all changes and modifications made during the review period <br />into the permit application. The applicant shall provide the Division <br />with four copies of the revised document. <br />Stipulation No. 1 Response <br />ACZ INC. is currently working on revising the Permit Application to <br />comply with this stipulation. <br />Stipulation No. 2 <br />Prior to any activity the permittee in any area not owne9 by Mr. Sam <br />Arness, and within sixty (60) days of permit issuance, the permittee <br />will submit comments from all owners of record of the surface within the <br />permit area regardin the proposed postmining land use in accordance <br />with Rule 2.05.5(2)(b~. <br />• Stipulation No. 2 Response <br />Mr. Sam Arness is currently working on collecting comments from all <br />owners of record of the surface within the permit area regarding the <br />proposed postmining land use. <br />Stipulation No. 3 <br />The applicant shall monitor the quantity of discharge from the abandoned <br />Victory No. 1 portal on a monthly basis. The applicant shall sample <br />this discharge quarterly for the parameters listed below <br />Ground Water Parameters: <br />pH (Field) Chloride Arsenic <br />Conductivity (Field} Magnesium Cadmium <br />Temperature (Field) Ammonia Iron <br />Total Dissolved Solids Nitrate-Nitrite Manganese <br />Bicarbonate (as CaCo3) Phosphate Mercury <br />Calcium Sodium Selenium <br />Carbonate Sulfate Zinc <br />Stipulation No. 3 Response <br />• Mr. Sam Arness is currently collecting water samples to comply with this <br />stipulation. <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.