My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102212
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:12 PM
Creation date
11/24/2007 8:38:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Permit File
Doc Date
8/27/2004
Doc Name
TOC & Appendix I-1
Section_Exhibit Name
Appendix I Water Resources
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />of observing drawdown during pumping tests <br />these wells is shown in Figure 6. <br />The typical construction of <br />Wells with 5-inch diameter completed in the overburden are numbered <br />96, 117> 122, 133, 163 and 172. Wells numbered 118, 119, 173 and 174 are <br />2-inch diameter wells completed in the overburden as drawdown observation <br />wells. Typical well construction of the 5-inch and 2-inch wells completed <br />in the overburden is shown in Figures 7 and 8. Well number 97 is completed <br />in both the overburden and the coal as shown in Figure 9. Schematic <br />drawings of the remaining wells are contained in Appendix A. <br />Seven separate determinations of the transmissivity of the overburden <br />were made. The wells involved in these determinations were 172, 122, 117, <br />118 and 119. Two determinations of the storage coefficient were made by <br />measuring the drawdown in wells 118 and 119 in response to pumping from <br />well 117. Similarly, eight determinations of the transmissivity of the <br />coal seam were made by running various tests on wells 137, 116, 61, 62, <br />and 60. Two values of the storage coefficient in the coal seam were <br />estimated from drawdown data in wells 60 and 62 in response to pumping <br />from well 61. The results of these tests are summarized in Table 1. <br />Details of the computations are presented in Appendix B and the raw data <br />in Appendix C. <br />• <br />•.. <br /> <br />• l <br />
The URL can be used to link to this page
Your browser does not support the video tag.