Laserfiche WebLink
A• ~ ENT L1111TATIONS AND MONITORING IIEQUIREI4EiIT: ~EE ANY ADDITIONAL REQUIREMENTS UNDER PART I • <br />Durlny the period beginning immediately and lasting through March 31, 1982 <br />the permlttoe Is authorized to discharge from outfall(s) serlel number(s) 001 . <br />1. Effluent Limitations <br />Effluent Parameter <br />Flow - m3/Day(MGD) <br />Total Suspedned Solids <br />Discharge Limitations <br />Maximum Weight <br />kg/day (IVs/day) <br />30-day avg. a/ Dally max. b/ <br />Maximum Concentration <br />mg/1 mg/1 <br />30-day avg. a/ Dally max. c/ <br />N/A ~ N/A N/A N/A <br />N/A N/A 3tl 45' <br />Oil and Grease shall not exceed 10 mg/1 In any grab sample nor shall there be a visible sheen. <br />The pli shall not be less than 6.O standard units nor greater titan 9.0 standard units c/ <br />There shall be no discharge of floating solids or visible foam In other titan trace amounts. <br />a/ Tltls limitation shall be determined by the arithmetic mean of a minimum of three (3) consecutive <br />samples taken on separate weeks In a 30-day per•lod (minimum total of three (3) samples); <br />b/ Tltis limitation means the total discharge by wel9ht during any calendar daytas determined by an <br />8-hour composite sample. <br /> <br /> <br />vv v <br />m m a <br />3 n 1 <br />M N <br />20 <br />c/ This limitation shall be determined by a single properly preserved sample as required .° -" <br />under monitoring requirements - Sample Type. <br />Any untreated overflow which is discharged from facilities designed, constructed, and operated to o <br />contain or treat a~ applicable all process generated wastewater and the surface runoff to the treat- o <br />ment facility from a 10-year, 24-hour preclpltatlor event shall not be subject to the limitations set 4°, <br />forth in this section. The 10-year, 24-hour precipitation event for this facility is 1.8 inches. m <br />The official precipitation gage station identified with the facility shall be Delta 3 NW. The `"' <br />permittee has the option of operating and maintaining a precipitation gage at the facility. <br />