i• <br />I • <br />• <br />EI. 9.00 ' <br />Max. Water <br />Embankment EI. 10.00' <br />v <br />1 O.OOX ~~ <br />Inlet EI. 7.00 ' <br />60.00' <br />24" CMP <br />n=0.024 Tailwoter <br />Plps Control <br />Outlet EI. 1.00' <br />Dspth 1.00' <br />The calculations above show that the peak flow for the 100 yeaz event in the drainage basin above <br />the permanent culvert is 26.46 cfs. The culvert design calculations show that a 24" CMP of 60 feet <br />length will handle approximately 40 cfs, therefore, the design is adequate. <br />4. Mine Facilities and Operation <br />The site will consist of a portable crushing and screening plant, portable stacker wnveyors, and <br />possibly a portable asphalt plant. The portable crush/screen plant will be dry operated by <br />subcontractor or western Gravel. In either case, the portable plant will maintain its own air emissions <br />permit and SPCC plan for the equipment. The plant will have its own generators and portable #2 <br />diesel tank of 2000 gallon size. This tank will have its own sewndary containment built under the <br />steel tank. The crush/screen plant will be brought to the site fora 4-6 week period per yeaz. The <br />screened material will then be sold throughout the year. <br />The asphalt plant will also have his own emission permit and SPCC plan. The plant will have its <br />own portable tank for hot mix as well as #2 diesel for the generator. These tanks are estimated at <br />3000 gallons each. Both of these tanks will also have secondary containment within the portable <br />plant. <br />Bellgardt Pit 1/06 <br />16 <br />