My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102109
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:08 PM
Creation date
11/24/2007 8:30:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.04.3 LAND USE INFORMATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
disturbed area are conservative for the sediment pond as designed. <br />• Therefore, the acreages have not been changed. <br />,v~- <br />11. The curve number 72, used for undisturbed acrea a is too low. From <br />the presented data it is shown that this number was erive using a <br />cover of 75%. The cover does not a ear that hi h and this curve <br />Hum er s ou a revise to re ect t e accurate percent cover. <br />RESPDNSF~ <br />Peerless Resources, Inc. has evaluated the curve number for the <br />undisturbed acreage and reestimated the amount of cover based on input <br />from the Colorado Mined Land Reclamation Division. The ground cover has <br />been revised to be approximately 55% yielding a curve number of 78 for <br />the Archuleta-Sanchez soil type. Corresponding estimates of peak flow <br />for Diversion Ditch No. 1, No. 2, and No. 3 have been revised utilizing <br />this basis. The estimates of peak flow for the sediment pond have not <br />been calculated. The original design calculations showed approximately <br />18% more area than that shown on the Surface Facilities Map (Map \?)• <br />• The resurveying of the area in mid-February, 1985, to provide more <br />accurate ground data, necessitated the revision of the disturbed areas <br />as shown. <br />12. How is water east of the and oin to be channelized inti <br />on ? It a ears that t is water wi ust on a ainst t e <br />an cou oossib v f ow to t e east an enter Ditch No. 2 <br />RESPONSE: <br />As shown on the Mine Facilities Map (Map 12), a temporary small <br />diversion ditch has been constructed in the previously placed spoil from <br />the Arness-McGriffin Coal Company operation to route surface drainage to <br />the sediment pond. <br />13. The culvert Homo ra h used in the desi n of the rinci al s illwa <br />shou a presente . <br />. RESPONSE: <br />The culvert nomograph used in the design of the principal spillway is <br />shown in Appendix 1. <br /> <br />_a3_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.