My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102109
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:08 PM
Creation date
11/24/2007 8:30:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.04.3 LAND USE INFORMATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ponds, Impoundment, and Diversions <br />• 3. Rule 4.05.4(2)(b) requires that <br />draining ~ater than one square <br />ear ou~i itation <br />diversion wi need to be redesi~ <br />unmooiriea stream cnanne <br />Cross-sections will be neces <br />the permit aoo itation w' <br />permanent diversions of watersheds <br />mile be desi ned to contain a 100 <br />'vent. a oa Gu ch ermanent <br />ne In addition, the ca acit of <br />east equa to the capacity of t e <br />oth upstream and downstream. <br />to verify this. Section 4.05.4 of <br />need to be revised since the <br />a watersneo of greater than one square mile ana ~oai ~uicn rails in <br />this category. <br />RESPONSE: <br />Peerless Resources, Inc. has completed the re-design of Diversion Ditch <br />No. 1 for the 100-year, 24-hour precipitation event. The capacity of <br />'the diverted channel is estimated to be at least the capacity of the <br />unmodified stream channel. The downstream channel has been previously <br />modified and cannot be compared with the existing designs. The <br />cross-section of the upstream channel entering the diversion ditch <br />• indicates that the design channel is as large as that previously in <br />place. <br />Design calculations for Diversion Ditch No. 1 are set forth in the <br />Drainage and Sediment Control Plan Appendix (Appendix 1) attached with <br />this technical adequacy response. The drainage basin for Diversion <br />Ditch No. 1 are shown on the Mine Facilities Map (Map 12) and the <br />Regional Hydrology Map (Map 6). <br />4. If, in the new Coal Gulch channel design, segments will continue to <br />be used, then a map delineating the segments wil be necessary. <br />RESPONSE: ' <br />Peerless Resources, Inc. has utilized two (2) segments in the design of <br />Diversion Ditch No. 1. These segments are shown on the Mine Facilities <br />Map (Map 12). <br />5. Pa a 4.05-4 states that a discussion of the ermanent channel is <br />foun in ection 2.05. owever t is a e a ears to e t e on <br />o ace in t e text tat t e permanent c anne is addressed. ease <br />-40- <br />
The URL can be used to link to this page
Your browser does not support the video tag.