Laserfiche WebLink
<br /> <br />IX. VESICLE $AIIL ROADS <br />CONTROL OPTIONS FOR VESICLE HAUL ROADS <br />(DO NOT WRITE IN T$I8 SECTION) <br />1. Watering (specify) times/day, to maintain moist surface. <br />2. Chemical stabilization <br />(according to manufacturer's specifications) <br />Specify: <br />a. Frequency of application and <br />b. Type of stapilizer (brand name, or composition) <br />3. Paving to be completed by <br />4. Gravel <br />(date). <br />(LIST HAIIL ROAD CONTROLS IN TSE APPROPRIATE SPACES BELOW) <br />L~~~~ c~~; ~ o~ v, ~ j ~ ~, b.;'i ,E <br />A. TRANSPORT OF RAW MATERIAL FROM REMOVAL BITE TO STOCRPILE <br />Distance (one way) <br />if stockpile is off site, give distance from removal site to mine <br />entrance <br />Haul vehicle capacity No. of wheels <br />Average vehicle speed m.p.h. <br />Maximum vehicle speed m.p.h. (cannot exceed 30 m.p.h) <br />No. of trips per day <br />Haul road silt content (if known) $. <br />List controls for raw materials transport: (see measures listed above) <br />Proposed controls <br />8 <br />