My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102095
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:07 PM
Creation date
11/24/2007 8:29:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
APPENDIX L SOILS & VEGETATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• D. REVECETATED AREA5 <br />D,1. Introduction <br />D.1.1. Scheduling activities in liability yeriod <br />i!e expect to revegetate 20 to 50 acres annually, but can not ,iustify fencing <br />and managing rangeland in such small parcels. Consequently, xe propose to <br />accumulate 160 to 400 acres before fencing and proceeding xith proof of <br />success. The most recent seeding to be included in a fenced area x111 have <br />completed five gmxing seasons xithout grazing. After fencing, the revegeta- <br />ted and reference areas will be grazed in txo consecutive years, then will <br />be protected from grazing in txo consecutive years to permit final measure- <br />ment of success. This procedure fulfills the regulation at 4.15.~(3)(f), <br />which states that "During at least the last two full years of the extended <br />liability period, the reference area(s) and revegetated area(s) shall receive <br />• the same management." Hoxever, xe aote conflict with 4,1$.5(1). xhich <br />requires grazing ", ,for at least the last ttro full years of the <br />liability period." To fulfill the requirements and provide the best possible <br />measurement of success, we hope to avid the use of caged plots in the last <br />two years by grazing in previous years and by adoption of the aimulated- <br />grazing alternative of 4,15.5(1). For cross reference to times of treatment <br />and sampling as described belox, xe identify the last seven years of the <br />liability period as Y4 through Y10. <br />D.1.2. Activities in years Y4, YS and Y6 <br />Restricted interseeding or transplanting, repair of rills and gullies, and <br />used control activities must be completed in Y4 and Y5, Consequently, we <br />rill measure sandsage density to determine possible need for traasplanting <br />and conduct a search for erosion and other problems in Y4. Remedial work <br />• rill be initiated as required. In Y5 xe rill initiate the demonstration <br /> <br />12' <br />
The URL can be used to link to this page
Your browser does not support the video tag.