Laserfiche WebLink
Recommended Condition <br />For Approval of <br />Four States Aggregates LLC, Line Camp Pit <br />M-2001-001 <br />Condition: Four States Aggregates, LLC (Four States) shall analyze at least one water sample each from <br />the existing pond at the Line Camp Pit and from the Dolores River upstream from the Pit. Both samples <br />shall be analyzed for all appropriate parameters. If the result for any parameter from the pond sample <br />exceeds that same parameter from the river sample, Four States shall immediately cease discharging water <br />from the pit, and shall not resume such discharge until it has submitted and the Division of Minerals and <br />Geology (Division) has approved and Four States has implemented either a technical revision or permit <br />amendment, as determined by the Division, describing how such water quality exceedances will minimize <br />impacts to the hydrologic balance. The attached table lists the appropriate parameters and maximum <br />acceptable detection levels. <br />4 <br />