Laserfiche WebLink
<br />• <br />~(~~~ <br />III I II I II I II IIII III Doc Date:12/11I2001 <br />999 <br />SECTION 6.0 Livestock Pond Construction Through 1993 and <br />Proposed Approximate Locations for 1994. <br />This section updates the CDMG on the locations of all constructed livestock ponds at Trapper Mine <br />through 1993 and projects approximate locations for proposed pond construction in 1994 (see attached <br />maps). The average pond density for Trapper mined-land areas will not exceed one pond per ten acres, <br />the density specified by the approved permit. Table 6-1 describes the as-built pond density in association <br />with the specific drainage areas. <br />In 1993, one new livestock pond was constructed in the newly established portion of W. No Name <br />drainage. <br />Enclosed map 6-1 also shows proposed pond locations that may be constructed by Trapper to accommo- <br />date the optimum density for livestock/wildlife use on the reclaimed area. Approximately five ponds are <br />proposed for construction in 1994 and should be completed by October 31st. Table 6-2 describes the pro- <br />jetted approximate drainage area per pond following construction in 1994. <br />As has been the case with previous livestock pond construction, future stock pond construction will meet <br />applicable certification standards. <br />IDMG\93RCPT61 <br />f ~ <br />~J <br />