Laserfiche WebLink
• iii iiiii im iii • <br />C Letter of Ao_reement <br />between the <br />Colorado Mined Land Reclamation Division <br />and <br />Pueblo Coal, Inc. <br />I. Introduction <br />Pueblo Coal Inc. (the operator) and the Colorado Division of Mined Land <br />Reclamation (the Division) hereby enter into the following agreement in regard <br />to continuation of the re view time period for renewal of Permit C-82-054 for <br />the Carbon Junction Mine beyond the 180 day timeframe specified in Section <br />119(2) of the Colorado Surface Coal Mining Reclamation Act (Act). Violation <br />of the timetables or conditions set forth below will constitute sufficient <br />reason for the Division to do fonrard with a recommendation to deny the <br />renewal application or the applicant to petition the Mined Land Reclamation <br />Board (the Board) for a hearing on the issues. <br />II. Conditions <br />A. By June 1, 1490, the operator will submit to the Division an <br />acceptable replacement bond or riser to the current bond, <br />increasing the reclamation bond amount to 51,125,300.00 or such <br />amount as agreed to by the parties to ensure reclamation of the <br />site. <br />B. The ooerator will continue to perform maintenance and monitoring at <br />the Carbon Junction Mine as reouired by the permit and regulations. <br />C. By December 11, 1989, the ooerator will submit to the Division <br />Annual Hydrologic Reports for the 1986, 1987, 1988 and 1989 water <br />years. The reports will include all reduced and taoulated <br />hydroiogic data collected during each year, as well as an <br />interpretation of the data and a discussion of any trends or <br />impacts to the hydrologic system. In addition, an undated probable <br />hydrolooic conseouences evaluation based on observations made and <br />data collected since permit issuance will be submitted. <br />D. By June 1, 1990 the ooerator will submit to the Division all <br />information necessary for the Division to render a decision on the <br />permit renewal. <br />:. The ooerator will not conduct any surface coal mining operations or <br />create additional surface disturbance with the exception of those <br />operations re dui red for routine monitoring and maintenance to <br />maintain the site in compliance. This condition will remain in <br />effect until a decision on the Dernit renewal is rendered by the <br />Division. <br />-1- <br />