Laserfiche WebLink
<br />EXHIBIT E - RECLAMATION PLAN <br />St. Jude Mine - Pioneer Uravan, Inc. <br />~nuary 20, 1978 <br />What little topsoil is available on the disturbed site will be removed, <br />stockpiled and seeded (to prevent erosion) in those areas shown on the detailed <br />map. (Exhibit C-2) <br />All buildings, fuel tanks, equipment, power lines and other man made <br />improvements will be removed. Portals will be plugged. All rock dumps, <br />roads, building sites and other disturbances will be recontoured when possible <br />to conform with the surrounding topography and then covered with the previously <br />stockpiled topsoil. Depth of topsoil will depend on the amount of topsoil <br />available. <br />No surface or subsurface water has been encountered in this area. <br />Revegetation of all affected areas will follow recommendations set <br />forth by all county, state and federal agencies which have jurisdiction or <br />special knowledge of the problem at that future time when mining operations <br />are completed. The following seeding mixture recommended by the Colorado <br />Mined Land Reclamation Board will be used unless new improved strains of seed <br />are made available: <br />Species <br />Pounds per acre <br />lvestern Wheatgrass 12 <br />Crested lJheatgrass 3 <br />Russian Wild rye 6 <br />Indian Rice grass 2 <br />Yellow Sweetclover 1 <br />Four Winged Saltbush 4 <br />Pioneer Uravan will follow a plan of reclamation suitable for wildlife <br />habitat, dry range land, and for recreational uses as set forth by the local <br />authorities at that future time when mining operations are completed. <br />