Laserfiche WebLink
EXHIBIT L -RECLAMATION COSTS <br />We have selected the phase of the mining that includes the largest area that will be disturbed atone time to <br />calculate the potential reclamation liability. This will occur during phase 4. <br />We have assumed that Phase 1 and 2 will be fully reclaimed and Phase 3 will behalf reclaimed. Final <br />grading and placement of the compacted clay liner and miscellaneous close out will be required for Phase <br />3. The processing area and all equipment associated with the processing area will have to removed along <br />with cleanup of the processing area. <br />SW TKO Joint Venture, LLC. -Adams Sand and Gravel Mine -112 Reclamation Permit Amendment Page 32 <br />