Laserfiche WebLink
\ 1 <br />y ~ • <br />Dir. Bob Freitag <br />Page -2- <br />other pite~not previously identified for topsoil salvage) such <br />topsoil will be saved (and stabilized) for reclamation puzposes. <br />2. Ail final graded slopes will be no greater than 2:1 {h:v) {Rule <br />6.1), with the exception that slopes of the Ansley Flat Pit, <br />as stated in your plan, will be no steeper than 3:1. <br />3. The appropriate diversion and sediment catching structures, as <br />recommended by the Soil Conservation Service for the P,oberte <br />Tunnel, A. L. Hill and Valley of the Sun Pita will be constructed <br />before summer 1981. <br />4. If plans for a recreational area (ball pnrlc) for the l'oodside Pit <br />are changed, the site will be reclaimed by grading, and revcEetation <br />(as per Soil Conservation Service recommendations), unless an <br />alternate reclamation or land use plan is developed, at which <br />time we are to be informed. Reclamation of this site is to be <br />carried to completion within 5 years (Rule G) from the daft of <br />this letter. <br />5. The Valley of the Sun °it nay require an Army Corps of ~nginocrs <br />404 permit. I suggest you call the P.esident rr:Cineer in Littleton <br />for more information. <br />}de will be happy to consult with you when it is time for reclamation of <br />these pits. <br />Sincerely, <br />D}i}:e Stanton <br />Reclamation Specialist <br />r}s:ye <br />