Laserfiche WebLink
Steamboat North Concrete Plant <br />GL 851 <br />SPCC Plan <br />and the public are protected. They are based on response training, Lafarge's internal <br />notification procedures, and ensuring that access to the spill azea is restricted. <br />Emergency-Response Contractors have been established and agreements include <br />approved emergency-response contractors to deal immediately with large spills. Spill <br />kits aze utilized to clean-up minor spills. The facility's countermeasures for cleanup of a <br />dischazge will ensure that all areas and media affected by the spill are identified, that the <br />health and safety of employees and the public are protected, and that the cleanup actions <br />will protect the quality of surface and groundwater resources. <br />112.7(al(31(v) <br />Materials recovered during spill cleanup can be recycled through on-site processes or <br />disposed of offsite. The decision between the two will depend on the types and quantities <br />of fuels or oils spilled; types and quantities of materials recovered during cleanup (i.e., <br />contaminated soil or water); and concentrations of oil products in the recovered materials. <br />Offsite disposal of contaminated materials can be recycled through a nearby Lafarge hot <br />plant, through a vendor, or an appropriate landfill. The Lafarge Environmental Manager <br />must approve all offsite disposals. <br />112.7 (a)(31(vi) <br />See the cover page of this Plan for the spill notification contacts. The clean-up contactors <br />to be utilized to handle large spills will be: <br />Environmental Resources Management (ERM) <br />Water and Waste Engineering, Inc. <br />Safety-Kleen <br />Lafarge Environmental Technical Services <br />303-741-5050 <br />303-292-3503 <br />303-761-1365 <br />303-657-4118 (P. Courtney) <br />303-657-4337 (A. Jenkins) <br />303-657-4335 (D. Harmon) <br />112.7 (aN41 <br />See Pages 1 & 2, and Attachment C, Discharge Report, which must be filled-out prior to <br />reporting a spill report to the proper notification contacts. The Lafarge Crisis <br />Management Plan and the first two pages of this Plan should be followed when <br />responding to an oil release. The Dischazge Report will help remind the operator of the <br />information which must be furnished. <br />11 <br />