Laserfiche WebLink
• Colorado Division of Minerals and Geo 1o• <br />ESTIMATING FORM - BULLDOZER WORK <br />Task p: 1 Prep. by: CLK Task File Name: M039-1 <br />____________ _________ _____________ <br />Date: 07/10/97 Permit p:M-97-039 Mine: William/Illinois Pit <br />____________ _________ _________________________________ <br />Permit Action: Nev Permit <br />_____________________________________________________________ <br />Task Description: Grade site <br />_____________________________________________________________ <br />HOURLY EQUIPMENT COST <br />_---------_________= Basic Machine: Cat DBN Horsepower: 295 <br /> Blade Type: SEMI-UNIVERSAL --"-""-- <br /> Attachment pl: ROPS Cab Shift Basis: 1/day <br /> Attachment p2; N(A -"~-"'-' <br />Cos[ Breakdown: <br />-"""-"'-"' Utili zation t <br />Ownership cost/hr = $40.05 N/A <br />Operating 6 overhaul rose/hr- dozer = $51.60 100 <br /> -ripper = $0.00 N/A <br />Operator cost/hr = $22.95 N/A <br />Total egpc. unit cos[/hr = $114.6] Total fleet cos[/hr: 5229.33 <br />________ ________ <br />MATERIAL QUANTITIES <br />IniC ial Swell Loose <br />Volume: 1,480.0 CCY Factor: 1.125 Volume: 1,665.0 LCY <br />____________ __________ _____________ <br />Source of quantity take-off: site/Exh tbic E <br />Source of est. swell factor: Cac Handbook <br />____________________________________________________ <br />HOURLY PRODUCTION <br />_____________•__= Job Condition Correction Factors <br />Avg. push dis [a nce: 250 ft. '"-""--"'-"--"'-"'- -'"' -" <br />'"- "'-" Operator.......... 0 .75 (avg.1 <br />Unadjusted hourly Mat. consistency.. 1 .00 ICat cbl) <br />dozer production: 354 LCY/hr Dozing method..... 1 .00 (gen.l <br />" " "-" Vrsibllity........ 1 .00 lavg.) <br />Material cons islency: Job efficiency.... 0 .fl3 (lsh/dayl <br />Consolidated stockpile Spoil pile factor. 0 .90 (ssd-fc) <br />________________________ _____________ Push grad Tent..... 1 .18 ICat cbl) <br />Avg. push gradient: 8.00 t (neg) Altitude deration. 1 .00 (Cat tbll <br />"'" '--'" Material weight... 1 .00 ICat Cbl) <br />Avg. site alCi tude: <br />____ 8940 Et. <br />_____ Blade Cype........ <br />________________________ 1. <br />_____ 00 <br />___ (S,SU, UI <br />Material weight 230 0.00 16/LCY Net Job Correction 0 .66 <br />Mat. Oes cr.: <br />GENERAL Fi LL <br />________________________ <br />_____________ Adjusted Unrt Protl.: <br />___ 234 <br />_____ .66 <br />___ LCY/hr <br /> Adjusted Fleet Production: 969 .33 LCY/hr <br />JOB COST "'- -'"' -" <br />Fleet size <br />____ 2 Do zez (s) <br />____ Total Job Trme: <br />____ 3 <br />____ .55 <br />___ Hours <br />Unit Cost $0 <br />____ .489 /LCY <br />____ Total Job Cost: <br />___ 5813 <br />_____ .58 <br />___ <br />