My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101781
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:56 PM
Creation date
11/24/2007 8:13:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997039
IBM Index Class Name
Permit File
Doc Date
7/11/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> <br />ROADABLE EQUIPMENT ~. sheet 2 of 2 <br />"-'-""--"'--"'- Total Ems. Flee[ Size Haul Trip Return Trip <br />Machine Description Cos[/hr (no. hauled( Cost/hr Cos[lhr <br />_ = Subtotals 50 DD = $0.00 <br />MOB/DEMOB SUPPORT EQUIPMENT: '"''---"' "---''"' <br />""-'""~-'"""-"""--'""-" Weight Ownership Haul Rig Flee[ Size Haul Trip Return Trip DOT Pe tmit <br />Non-Roadable Eqp. Description Icons) Cosc/hr Cost/hr (no. hauled) Cost (hr Cost(hc Costl ea <br /> Subtotals $D. DD <br />_________ $0.00 $0.00 <br />_________ _________ <br />Total Eqp. Flee[ Srze Haul Trip Return Trip <br />Roadable Eqp. Description Cos[/hr Ino. hauled) Cost/hr Cosc/hr <br />Subtotals 50.00 $O. Do <br />_________ _________ <br />EQUIPMENT HAUL DISTANCE k TIME <br />Nearest major city or town within project area region: <br />Total one way travel dis Ca nce = 3.0 miles. Average travel speed 25.00 mph. <br />______ _____________ <br />Job Tame - Non Roadable Equip.= 0.50 hours load Roadable Equip.= N/A hours load <br />0.12 hours haul 0.12 hours haul <br />0.50 hours unload N/A hours unload <br />0.12 hours return 0.12 hours return <br />JOB COST Total Mob/Demob Cosc = $1,001.29 <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round cri ps, each Grip <br />consisting of a one-way loaded haul and a one-way empey return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certa rn <br />specified road segments within the Scat e. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading Cimes must be increased su bs[antial ly for equipment which must be <br />pare ally dismantled for transport and re-assembled at [he job siCe. Costs for li£C mg equipment and ocher <br />support equipment needed Eor [his work should be included rn [he mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.