• Attachment 3 <br /> Estimated Costs of Reclamation <br /> Reclamation consists of replacing overburden, top soil, and <br /> reseeding an area of approximately 9 acres. The equipment <br /> estimated to be used to reclaim the site includes a Cat 623 self <br /> loading scraper and a medium size dozer such as a Cat D6. <br /> Reclamation costs are estimated as follows: <br /> Replace stockpiled overburden on pit slopes at an average depth of <br /> six inches and spreading the remaining overburden on the plant site <br /> and stockpile area. Assuming average depth of overburden at <br /> eighteen inches over a nine acre site, approximately 22 ,000 cubic <br /> yards must be replaced. <br /> Assume replace 4 , 000 cubic yards per day with two Cat 623 scrapers <br /> and one D6 dozer. <br /> Hourly cost of 623 90. 00 <br /> Hourly cost of 623 90. 00 <br /> Hourly cost of D6 60. 00 <br /> Total hourly costs 240. 00 <br /> Daily costs/ 8 hr day 1,920.00 <br /> Estimate 5. 5 days, costs for overburden 10, 560. 00 <br /> ® Replace stockpiles topsoil on pit slopes, plant site and stockpile <br /> at an average depth of six inches. Top soil to be replaced is <br /> estimated at 7 ,250 cubic yards. Using the same equipment for <br /> replacing overburden allow two days to replace the top soil. <br /> Estimate for replacing topsoil 3 ,840.00 <br /> Estimate for seed at $100. 00/acre 900. 00 <br /> Estimate for tractor and seed drill <br /> at $25. 00/hr for 8 hrs. 200. 00 <br /> Total estimate for reclamation 15, 500. 00 <br />