My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-01-19_PERMIT FILE - M1994006
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1994006
>
1994-01-19_PERMIT FILE - M1994006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2021 8:10:24 PM
Creation date
11/24/2007 8:12:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994006
IBM Index Class Name
Permit File
Doc Date
1/19/1994
Section_Exhibit Name
SCHREPFER BORROW AREA - SECTION I - MAPS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Attachment 3 <br /> Estimated Costs of Reclamation <br /> Reclamation consists of replacing overburden, top soil, and <br /> reseeding an area of approximately 9 acres. The equipment <br /> estimated to be used to reclaim the site includes a Cat 623 self <br /> loading scraper and a medium size dozer such as a Cat D6. <br /> Reclamation costs are estimated as follows: <br /> Replace stockpiled overburden on pit slopes at an average depth of <br /> six inches and spreading the remaining overburden on the plant site <br /> and stockpile area. Assuming average depth of overburden at <br /> eighteen inches over a nine acre site, approximately 22 ,000 cubic <br /> yards must be replaced. <br /> Assume replace 4 , 000 cubic yards per day with two Cat 623 scrapers <br /> and one D6 dozer. <br /> Hourly cost of 623 90. 00 <br /> Hourly cost of 623 90. 00 <br /> Hourly cost of D6 60. 00 <br /> Total hourly costs 240. 00 <br /> Daily costs/ 8 hr day 1,920.00 <br /> Estimate 5. 5 days, costs for overburden 10, 560. 00 <br /> ® Replace stockpiles topsoil on pit slopes, plant site and stockpile <br /> at an average depth of six inches. Top soil to be replaced is <br /> estimated at 7 ,250 cubic yards. Using the same equipment for <br /> replacing overburden allow two days to replace the top soil. <br /> Estimate for replacing topsoil 3 ,840.00 <br /> Estimate for seed at $100. 00/acre 900. 00 <br /> Estimate for tractor and seed drill <br /> at $25. 00/hr for 8 hrs. 200. 00 <br /> Total estimate for reclamation 15, 500. 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.