Laserfiche WebLink
PART II <br />Page No. 20 <br />Permit No. CO-0036595 <br />•~ A. NOTIFICATION REQUIREMENTS <br />., ~ ~_ <br />a. Effect of an Upset. <br />An upset constitutes an affirmative defense to an action brought for noncompliance with permit effluent limitations <br />the requirements of paragraph (b) of this section are met. No determination made during administrative review of <br />claims that noncompliance waz caused by upset, and before an action for noncompliance, is final administrative <br />action subject to judicial review. <br />b. Conditions Necessary for a Demonstration of Upset <br />A permittce who wishes to establish the affirmative defense of upset shall demonstrate through properly signed <br />contemporaneous operating logs, or other relevant evidence that: <br />i. An upset occurred and that the permittee can identify the specific cause(s) of the upset; and <br />ii. The permitted facility was at the time being properly operated and maintained; and <br />iii. The permittee submitted proper notice of the upset az required in Part II.A.4. of this permit (24-hour notice); <br />and <br />iv. The permittee complied with any remedial measure necessary to minimize or prevent any discharge or sludge <br />use or disposal in violation of this permit which haz a reason able likelihood of adversely affecting 6utttan health <br />or the environrrtent. <br />•-~ In addition to the demonstration required above, a permittce who wishes to establish the affirmative defense of upset <br />for a violation of effluent limitations hazed upon water quality standards shall also demonstrate through monitoring, <br />modeling or other methods that the relevant standards were achieved in the receiving water. <br />c. Burden of Proof <br />In any enforcement proceeding the permittce seeking to establish the occurrence of an upset has the burden of proof. <br />8. Discharee Point <br />Any discharge to the waters of the State from a point source other than specifically authorized by this permit is <br />prohibited. <br />9. Prager Operation and Maintenance <br />The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and <br />related appurtenances) which are installed or used by the permittee az necessary to achieve compliance with the <br />conditions of this permit. Proper operation and maintenance includes effective performance and adequate laboratory and <br />process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or <br />auxiliary facilities or similaz systems which are installed by the permittce only when necessary to achieve compliance <br />with the conditions of the permit. <br />10. Minimization of Adverse ImoaM <br />•~ The permittee shall take all reazonable steps to minimize or prevent any discharge of sludge use or disposal in violation <br />of this permit which haz a reazonable likelihood of adversely affecting human health or the environment. As necessary, <br />accelerated or additional monitoring to determine the nature and impact of the noncomplying discharge is required. <br />INDV Ne,r~ 1~, Iw <br />