Laserfiche WebLink
• Information an Item # 5. <br />Exploration taking place inside and outside of the permit area will be handled <br />through the Notice of Intent (NOI) procedures. See the appropriate NOI for <br />details for each program. <br />with the approval of Technical revision 50, all exploration holes located within <br />the permit boundary are transferred to NOI X-95-109-5 and are managed under Coal <br />Exploration procedures. <br />Wells drilled ae an integral part of water monitoring plane identified in the <br />PAP (Permit C-81-019) and water supply wells (for mining purposes) are managed <br />under this Permit C-B1-019. <br />4.21.5 Requirements for a Permit <br />No coal will be removed or extracted by the proposed coal exploration other than <br />occasional spot coring. No coal will be removed or extracted for commercial sale <br />during coal exploration. <br /> <br />• 9 .21- 3 Rgyjgip~ Submitted I ' ~ 3 -' I <br />Revision No. T R - Sy <br />