Laserfiche WebLink
__ iii iiiiiiiiiiiii iii <br />999 <br />• Doc Date:12/11/2001 l <br />~~~ RULE Z.O1 GENERAL PERMIT REQUIREMENTS <br />2.01.1 Scope <br />This section establishes the minimum general requirements for <br />permits required for surface coal mining and reclamation oper= <br />ations within the State of Colorado. Its objective is to ensure <br />that all operations within Colorado make timely permit appli- <br />cations and that all surface coal mining and reclamation oper- <br />ations are conducted only under permits issued in accordance <br />with the requirements of the Permanent Regulatory Program <br />currently in existence. <br />2.01.2 General Requirements For Existing Operations <br />Information within this application follows the current Colorado <br />• Regulations in format and provides information to each specific <br />section as required within these regulations. Hydrologic and <br />geologic information which has been or is being collected by the <br />"Small Operators Assistance Program" contractor is also included. <br />Information which is currently being developed but not yet <br />complete will be submitted and input within the appropriate <br />section upon completion. <br />2.01.3 General Requirements For Permits For All Surface Coal <br />GEC Minerals, Inc. is requesting the approval of this surface <br />mining and reclamation plan and the assurance of a permit to <br />continue coal mining operations at its mine near Florence, <br />Colorado. GEC Minerals, Inc. believes that this permit is complete <br />in accordance with the Colorado Mined Land Reclamation Act (Section <br />34-33-101, C.R.S., 1973, as amended) and the Rules and Regulations <br />promulgated thereunder. <br />• <br />2.01-1 <br />