| <br />
<br />TABLE 28 BONDING TRANSFER for Coal Exploration bonded under Permit Revisions
<br />		Approved		Transfer to		"Unused"		Transfer	Applicable
<br />Permit Revision	Bond Amount	Industrial Use		Reduce		Bond	NOI
<br />				(TR-45)	B	ond Amount		to an NOI	
<br />TR-26 - (NM21,25,27,28 also bonded in CX-92-213-02)	$	29,100.00							
<br />SF-3; SF-4; SF-5; SF-6; SF-7 (NOT CONSTRUCTED)					$	13,227.00			
<br />SF-1 (33-94); SF-2 (32-94)							$	5,291.00	CX-93-213-0
<br />NM-21 (11-94) ;NM-25 (19-94); NM-27 (15-94); NM-28 (16-94)					$	10,582.00	$	0.00	CX-92-213-0
<br />TR-29	$	15,555.00							
<br />GE-2-93; GE-4-93; GE-5-93 (NOT CONSTRUCTED)									
<br />GE-1 (74-94); GE-3 (73-94); GE-6 (72-94)			$	15,555.00					
<br />TR-36	$	82,230.00							
<br />GE-80; GE-85; GE-86; GE-87; GE-88; GE-89; GE-90; GE-91							$	31,326.00	CX-91-175-2
<br />GE-81, 82, 83, 84, GE-92, 93, 94, 95, 96, 97, 98, 99, 100 (not constructed)				$	50,904.00			
<br />MR-5	$	7,291.00						0.00	
<br />E-1, E-2			$	7,291.00					
<br />MR-6	$	7,291.00						0.00	
<br />E-1a			$	7,291.00					
<br />MR-9	$	3,462.00							
<br />V-1			$	3,462.00					
<br />MR-10	$	10,124.00							
<br />GE-41,42							$	2,531.00	CX-91-175-2
<br />GE-36, 37, 38, 39							$	5,062.00	CX-92-213-D
<br />GE-40, GE-44,45			$	2,531.00					
<br />MR-11	$	855.00							
<br />Grounding Hole (SD-2 or Power Drop)			$	428.00					
<br />Cased Service Borehole (SD-3) (Not Constructed)					$	427.00			
<br />MR-15	$	7,081.00							
<br />GE90-2 (Not Constructed)					$	4,154.00			
<br />GE90-3 (Emulsion drop or SD-1 in TR-45)			$	2,927.00					
<br />MR-21	$	40,571.00							
<br />GE-1(59-91);GE-2(54-91);GE-3(56-91);GE-6(57-91);GE-9(55-91);GE-11(	56	-91)					$	22,131.00	CX-91-175-2
<br />GE-4, 5, GE-7, 8, GE-10 (Not Constructed)					$	18,440.00			
<br />MR-22	$	43,494.00							
<br />1991 Exploration - 22 Coreholes (Not Constructed)					$	43,494.00			
<br />(Revision 11/26/97 TR-47)
<br />Ex. 19-5
<br /> |