Laserfiche WebLink
• 3. In accordance with Rule 4.15.10 (2), satisfactory cover, plant life or gravel base, or other erosion <br />control methods will be employed at these industrial use sites to control erosion. Final bond release for <br />these sites shall occur as soon as [Ite requirements of Rule 4.15/102) have been met. <br />4. The reclamation bond for each of these facilities is listed in Table 24, Exhibit 31. The total for all <br />facilities vansferred to Industrial use is $128,911.47. The Golden Eagle Bond shall be reduced <br />accordingly. <br />• <br />(Rtvision 10/16/97-TR45) <br />. Ex. 19-2 <br />