My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101543
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101543
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:47 PM
Creation date
11/24/2007 8:02:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979191
IBM Index Class Name
Permit File
Doc Date
2/8/1980
Doc Name
THREE BELLS RANCH ASSOC PIT FN 79-191
From
MLR
To
THREE BELLS RANCH ASSOC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiuiii <br />February 8, 1980 <br />Mr. Hobert W. Shields <br />The Three Bells Ranch Associates <br />1520 East Mulberry - Suite 150 <br />Fort Collins, Colorado $0524 <br />' RSc Tba Three Bells Ranch Associates Pit <br />Our File No. 79-191 <br />Dear Mr. Shields: <br />The floating bond will cover 100 acres, this berg the maximum numhar oP <br />acres to be disturbed at any one time. The disturbance wi11 be broken <br />down into the following categories: <br />40 A Major <br />50 A Moderate <br />10 A Minor <br />See Rule 2.12 (4) d. for a description of ttaeae categories. For this <br />operation, Major disturbance will be fig~sed ae 30 scree of pond and 10 <br />acres of excavation, avezbiadea and topsoil stockpiles, etc. <br />Tin following is a breakdaaz of the estimated reclamation costs as <br />determined by using the data you supplied: <br />A -Major anti Moderate <br />1. Replace 12 inches of topsoil aver 60 acres (approximately <br />98,000 cubic yards) at 30C/cubic yard = $29,400. <br />2. Soil preparation at $110/acre ~ $6,600. <br />3. P.~ri7i~„tivn estimate 200 lbs./acre at 50Q/lb. - 6,000. <br />4. Seeding at $150/acre - $9,000. <br />5. Total coat $51,000. <br />B. Minor <br />1. Soil preparation at $110/acre ~ $1,100. <br />2. Fertilization $100/acre ~ $1,000. <br />3. Seeding at $150/acre ~ $1,500. <br />4. Total cost - $3,600. <br />
The URL can be used to link to this page
Your browser does not support the video tag.