My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101537
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101537
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:46 PM
Creation date
11/24/2007 8:02:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997027
IBM Index Class Name
Permit File
Doc Date
5/6/1997
Doc Name
CONSTRUCTION MATERIALS LIMITED IMPACT OPERATION 110 RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-4- <br />~a & Exhibits- <br /> <br />Submit TWO (21 complete, unbound conies of the following application exhibits: <br />6.3.1 EBHZBIT A - Legal Description and Location Nap <br />6.3.2 E%HIBIT B - Site Description <br />6.3.3 BEBIBIT C - Hining Plan <br />6.3.4 E%HIBIT D - Reclamation Plan <br />6.3.5 SBBIBIT E - Naps <br />6.3.6 E~IBZT F - List of Other Permits and Licenses Required <br />6.3.7 EBHIBIT G - Source of Legal Right-to-Enter <br />6.3.8 EIDIBIT H - Municipalities Within a Two-mile Radius <br />6.3.9 EEBIBIT i - Proof of Filing with County Clerk <br />6.3.10 ~IBIT J - Proof of Mailing Notices Of Permit Application <br />6.3.12 EBBIBIT L - Permanent Man-Made Structures <br />6.1.2(1)(b) ADDENDIDS 1 - Notice Requirements (sample enclosed) <br />6.5 Geotechnica l Stability Exhibit (ae required) <br />Resvonsibilities as a Permittee: <br />IIpon application approval and permit issuance, this application becomes a legally <br />binding document. Therefore, there are a number of important requirements which <br />you, as a permittee, should fully understand. These requirements are listed <br />below. Please read and initial each requirement, in the space provided, to <br />acknowledge that you understand your obligations. If you do not understand these <br />obligations then please contact this Office for a full explanation. <br />~G 1. Your obligation to reclaim the site is not limited to the amount of the <br />~ financial warranty. You assume legal liability for all reasonable expenses <br />which the Board or the Office may incur to reclaim the affected lands <br />associated with your mining operation in the event your permit is revoked <br />and financial warranty is forfeited; <br />/l~ 2. The Board may suspend or revoke this permit, or assess a civil penalty, <br />upon a finding that the permittee violated the terms or conditions of this <br />permit, the Act, the Mineral Rules and Regulations, or that information <br />contained in the application or your permit misrepresent important material <br />facts; <br />~L 3. If your mining and reclamation operations affect areas beyond the <br />boundaries of an approved permit boundary, substantial civil penalties, to <br />you as permittee can result; <br />~~ 4. Any modification to the approved mining and reclamation plan from those <br />J described in your approved application requires you to submit a permit <br />modification and obtain approval from the Board or Office; <br />5. It is your responsibility to notify the Office of any changes in your <br />address or phone number; <br />~(i 6. Upon permit issuance and prior to beginning on-site mining activity, <br />J you must post a sign at the entrance of the mine site, which shall be <br />cleazly visible from the access road, with the following information (Rule <br />3.1.12): <br />
The URL can be used to link to this page
Your browser does not support the video tag.