Laserfiche WebLink
J <br />w <br />W <br />D <br />-< <br />F--` <br />Cal <br />cD <br />[.C <br /> <br />Table 1.4J. Caleulatlon for Tlms Required m Rsprade Roede <br />Flast Cost <br /> <br />Equipment <br />Ovmerehlp Opsratlon 8 <br />Overhaul <br />ttechmanb <br />Operator <br />Total <br />Cat D10N (Hopis shin) 56.46 96.38 8.08 22.95 190.85 <br />(universal Nods) <br />LIpM PIaM 0.00 0.00 0.00 0 0 <br />Total SB.48 98.36 9.OB 22.85 180.85 <br />' Ripper costs InGutlsd for ripping, omkted for predlrq <br /> Length Volutrra Vduma Ripping Reprads <br />Road Descrlptlon Typs (ft) (boys) ~26X evnll Hours Hours <br />fiC Road Walk 8,180 168,237 207,798 188 1fi8 <br />DMAIN Walk 7,500 138,111 170,138 137 138 <br />Oi5 Maul 2,480 41,333 51,687 42 41 <br />D Loop Haul 7,520 125,933 158,887 127 125 <br />DK1,4 Haul 1,640 27,333 34,167 28 27 <br />Di1 Haul 1,600 28,687 33.333 27 27 <br />AMAIN VWIk 5,510 100,i76 125,222 101 100 <br />ASHWEST Haul 7,240 120,687 150,833 122 120 <br />H Walk Walk 5,280 95,822 118,778 87 88 <br />North A Wnik 9,280 168,415 210,519 170 168 <br />LOM Walk 11,000 188,830 249,537 202 188 <br />Middle A Haul 8,040 134,000 187,500 135 134 <br />FS Heul 1,400 23,333 29,167 24 23 <br />F4 Haul 3,840 80,867 75,833 61 80 <br />F3 Haul 2,320 38,667 48,333 39 3B <br />F2 VWIk 2,680 48,837 80,786 49 4B <br />F1 Heul 4,320 72,000 80,000 73 72 <br />FMAIN Haul 3,000 50,000 62,500 51 50 <br />EF7 Haul 3,040 50,887 83,333 51 51 <br />EF2 Heul 2,520 42,000 52,500 42 41 <br />GMAIN Haul 5,040 84,000 105,000 85 81 <br />G7 Haul 3,800 60,000 75,000 61 60 <br />G2 Haul 3,800 63,333 78,167 64 63 <br />G3 Heul 3,840 84,000 80,000 65 84 <br />G4 Haul 3,040 50,687 83,333 51 51 <br />GS Haul 4,040 67,333 84,167 6B 87 <br />East A Haul 8,160 102,887 128,333 104 102 <br />~~_~~ <br />~~ <br />1Dgg ~ <br />IMMO J ~ <br />{~ti-1~----._.,. i <br />rrsrr .. .._ __._~ , _~_ ! <br /> <br />