J
<br />w
<br />W
<br />D
<br />-<
<br />F--`
<br />Cal
<br />cD
<br />[.C
<br />
<br />Table 1.4J. Caleulatlon for Tlms Required m Rsprade Roede
<br />Flast Cost
<br />
<br />Equipment
<br />Ovmerehlp Opsratlon 8
<br />Overhaul
<br />ttechmanb
<br />Operator
<br />Total
<br />Cat D10N (Hopis shin) 56.46 96.38 8.08 22.95 190.85
<br />(universal Nods)
<br />LIpM PIaM 0.00 0.00 0.00 0 0
<br />Total SB.48 98.36 9.OB 22.85 180.85
<br />' Ripper costs InGutlsd for ripping, omkted for predlrq
<br /> Length Volutrra Vduma Ripping Reprads
<br />Road Descrlptlon Typs (ft) (boys) ~26X evnll Hours Hours
<br />fiC Road Walk 8,180 168,237 207,798 188 1fi8
<br />DMAIN Walk 7,500 138,111 170,138 137 138
<br />Oi5 Maul 2,480 41,333 51,687 42 41
<br />D Loop Haul 7,520 125,933 158,887 127 125
<br />DK1,4 Haul 1,640 27,333 34,167 28 27
<br />Di1 Haul 1,600 28,687 33.333 27 27
<br />AMAIN VWIk 5,510 100,i76 125,222 101 100
<br />ASHWEST Haul 7,240 120,687 150,833 122 120
<br />H Walk Walk 5,280 95,822 118,778 87 88
<br />North A Wnik 9,280 168,415 210,519 170 168
<br />LOM Walk 11,000 188,830 249,537 202 188
<br />Middle A Haul 8,040 134,000 187,500 135 134
<br />FS Heul 1,400 23,333 29,167 24 23
<br />F4 Haul 3,840 80,867 75,833 61 80
<br />F3 Haul 2,320 38,667 48,333 39 3B
<br />F2 VWIk 2,680 48,837 80,786 49 4B
<br />F1 Heul 4,320 72,000 80,000 73 72
<br />FMAIN Haul 3,000 50,000 62,500 51 50
<br />EF7 Haul 3,040 50,887 83,333 51 51
<br />EF2 Heul 2,520 42,000 52,500 42 41
<br />GMAIN Haul 5,040 84,000 105,000 85 81
<br />G7 Haul 3,800 60,000 75,000 61 60
<br />G2 Haul 3,800 63,333 78,167 64 63
<br />G3 Heul 3,840 84,000 80,000 65 84
<br />G4 Haul 3,040 50,687 83,333 51 51
<br />GS Haul 4,040 67,333 84,167 6B 87
<br />East A Haul 8,160 102,887 128,333 104 102
<br />~~_~~
<br />~~
<br />1Dgg ~
<br />IMMO J ~
<br />{~ti-1~----._.,. i
<br />rrsrr .. .._ __._~ , _~_ !
<br />
<br />
|