Laserfiche WebLink
<br />Tabls 1.43 Rearadlnn pits page 2 <br /> Push Productivity Correction Productivity Dozer Unit Cost Total <br />Cross Section Cubic Yarde Diatanca (ICyRv) Factor (Icylhr) Hours (S/hr) Cosryi) <br />Nbst Ash Diseosal Sits <br />Cross Section 1 <br /> 106343 298 950 0.53 504 215 251.10 54,032 <br />Cross Section 2 <br /> 193278 364 800 0.53 424 456 251.10 114,463 <br />Crass Section 3 <br /> 82349 355 805 0.53 427 193 251.10 48,466 <br />Cross Section 4 <br />Subtotal 383970 343 B43 0.53 447 859 251.10 215,693 <br />North Ash Disposal Site <br />Cross Section 1 <br /> 87590 359 795 0.80 636 136 251.10 34,582 <br />Cross Section 2 <br /> 306791 35B BOS O.BO 644 479 251.10 120,400 <br />Cross Section 3 <br />w 271676 354 805 0.80 644 422 251.10 105,928 <br /> <br />~ Cross Section 4 <br /> 302778 395 710 0.80 568 533 251 10 133,851 <br />Cross Section 5 <br /> 261388 374 775 0.80 620 422 251.10 105,862 <br />Cross Section 6 <br />Subtotal 1232223 370 775 080 620 1994 251.10 500,623 <br />Total 161679] 363 791 0.74 579 2853 251 10 716,316 <br />_~ <br />N <br />W <br />.J <br /> <br />rOMepG <br />ILIp1l <br />