Laserfiche WebLink
<br />TABLE 1 <br />ACTIVITIES ASSOCIATED WITH MINING <br />.::::.:::Actlvt ...::r``::::::: :::Aitunber::o .;:': ;::;::::::'::::'.:::'.'::"::<::::::'::':.:'; .;:...:.:.::.-• .:::::.:::::.`?::: ;.::: !::: '" ;:.;::`:;:' <br /> Ploy .. .. .......::........ ::..:..::::...::•:•::..::..:::::::::-::::.:.:::: ;::..: ;:.:::.:.:::::::>:.:;;::. ;. :. <br />Mining/Reclamation 8 The aggregate resowce will be removed in 10-acre <br /> incremenu. An azea is dewatered, topsoil and overburden <br /> is removed and stockpiled, and material is removed with an <br /> excavator and placed in haul trucks for transpott to the <br /> mining processing site. Concurrent reclamation includes <br /> shaping banks and seeding completed azeas as mining <br /> proceeds. <br />Office 2 The office will be used for administrative activities <br /> including record keeping, sale of materials and general <br /> supervision of site activities. <br />Mining Processing 10 Processing will include sorting and washing material for <br /> use in on-site batch plants and for off-site deliveries. <br />Concrete Batch 25 The concrete batch plant will be used to mix cement, water, <br />Plant sand and gravel to produce ready mix concrete for <br /> transport from the site in Hall-Irwin (Bestway) ready mix <br /> concrete trucks and to sell to other vendors using their <br /> trucks. <br />Asphalt Batch Plant 5 The asphalt batch plant will mix petroleum products, sand <br /> and gravel to produce asphalt paving materials for use by <br /> Hall-Irwin Construction Company and to sell to other <br /> vendors. <br />ConcretelAsphalt 2 This plant will crush waste concrete and asphalt produced <br />Recycling Plant at the site and material transported to the site for recycling. <br /> This material will then be sold for use as road base, road <br /> surfacing and other applications that can use recycled <br /> materials. <br />Equipment 4 Equipment maintenance is an on-going activity associated <br />Maintenance with the mining and processing activities at the site. An <br /> equipment/shop building will house tools and other <br /> maintenance equipment and maintenance activities that can <br /> take place inside a building. All equipment is maintained <br /> to provide safe, efficient operations a[ the facility at all <br /> times. <br />Ha!!-Irwin Mining Proposes! jot the Shores - MLRB 1 !2 Permii <br />