My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101499
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101499
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:45 PM
Creation date
11/24/2007 8:00:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Permit File
Doc Date
2/24/1998
Doc Name
PERMIT APPLICATION
From
HALL-IRWIN CONSTRUCTION CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TABLE 1 <br />ACTIVITIES ASSOCIATED WITH MINING <br />.::::.:::Actlvt ...::r``::::::: :::Aitunber::o .;:': ;::;::::::'::::'.:::'.'::"::<::::::'::':.:'; .;:...:.:.::.-• .:::::.:::::.`?::: ;.::: !::: '" ;:.;::`:;:' <br /> Ploy .. .. .......::........ ::..:..::::...::•:•::..::..:::::::::-::::.:.:::: ;::..: ;:.:::.:.:::::::>:.:;;::. ;. :. <br />Mining/Reclamation 8 The aggregate resowce will be removed in 10-acre <br /> incremenu. An azea is dewatered, topsoil and overburden <br /> is removed and stockpiled, and material is removed with an <br /> excavator and placed in haul trucks for transpott to the <br /> mining processing site. Concurrent reclamation includes <br /> shaping banks and seeding completed azeas as mining <br /> proceeds. <br />Office 2 The office will be used for administrative activities <br /> including record keeping, sale of materials and general <br /> supervision of site activities. <br />Mining Processing 10 Processing will include sorting and washing material for <br /> use in on-site batch plants and for off-site deliveries. <br />Concrete Batch 25 The concrete batch plant will be used to mix cement, water, <br />Plant sand and gravel to produce ready mix concrete for <br /> transport from the site in Hall-Irwin (Bestway) ready mix <br /> concrete trucks and to sell to other vendors using their <br /> trucks. <br />Asphalt Batch Plant 5 The asphalt batch plant will mix petroleum products, sand <br /> and gravel to produce asphalt paving materials for use by <br /> Hall-Irwin Construction Company and to sell to other <br /> vendors. <br />ConcretelAsphalt 2 This plant will crush waste concrete and asphalt produced <br />Recycling Plant at the site and material transported to the site for recycling. <br /> This material will then be sold for use as road base, road <br /> surfacing and other applications that can use recycled <br /> materials. <br />Equipment 4 Equipment maintenance is an on-going activity associated <br />Maintenance with the mining and processing activities at the site. An <br /> equipment/shop building will house tools and other <br /> maintenance equipment and maintenance activities that can <br /> take place inside a building. All equipment is maintained <br /> to provide safe, efficient operations a[ the facility at all <br /> times. <br />Ha!!-Irwin Mining Proposes! jot the Shores - MLRB 1 !2 Permii <br />
The URL can be used to link to this page
Your browser does not support the video tag.