Laserfiche WebLink
r_ <br />INDEX TO DECEMBER 17, 1984 CMLRD REVIEW COMMENTS • <br />COVERED IN TNIS REPORT <br />CMLRD Comment <br />TOP SOIL <br />1. Section 3.2 pp. 5-6 and Section 8.1.1 p 34 <br />1. On-site topsoil and subsoil will be used <br />for cover. <br />2. Soil material will be stored east of the <br />refuse disposal limit. <br />3. Test plot studies will be evaluated by <br />WECC. <br />2. Section 3.2 00 5-6 and Section B.I.i o 34 <br />1. Initially, approximately 10 acres will be <br />stripped to a depth of 4.5', resulting in <br />approximately 70,000 cu. yds. to be <br />stored, which will be used to cover the <br />final phase. <br />2. The stockpile boundary shown on WECC's <br />original application Drawing No. 001, p. 1 • <br />of 2 will accommodate approximately 70,000 <br />cu. yds. <br />3. As referenced on page 61 of the original <br />application, please see Sections 4.4.3 and <br />4.4.2 of the Mt. Gunnison M and R Plan. <br />4. N/A <br />5. Section 3.2, p. 6 <br />A buffer zone of 20 feet will be <br />maintained beyond the fill placement area <br />and the undisturbed area. <br />6. Section 8.1.3 p. 36 <br />DRAINAGE <br />1. Please see pages 42 through 45 of the <br />original application. <br /> <br />