Laserfiche WebLink
None of the proposed diversions will drain into the underground <br />• operation. <br />4.05.4 Stream Channel Diversions (Relocation of Streams) <br />Peerless resources will and has relocated the Goal Gulch. <br />All Discussions are related to ditch no.1 in exhibit #13• <br />4.05.5 Sediment Control Measures <br />Sediment control measures to be implemented are shown on the Mine <br />Facilities Map (Map 12). These facilities, consisting primarily of <br />diversion ditches and a sedimentation pond, will be located, <br />constructed, and maintained to avoid erosion and increased contribution <br />of sediment load to runoff. Discussion on sediment and drainage control <br />is presented under Section 2.05.6. <br />If encountered during the underground operation, water will be treated <br />in underground sump areas prior to discharge. Any water encountered <br />underground will also be utilized to facilitate dust control <br />underground. <br />Although the primary means of sediment control are diversion structures <br />and a sedimentation pond, Peerless Resources will utilize, as necessary, <br />straw dikes, riprap, check dams, mulches, vege±ative sediment filters, <br />dugout ponds, or other measures that reduce overland flow velocity or <br />runoff volume. see ~zh~6i%** ~3 <br />4.05.6 Sedimentation Ponds <br />The location of the planned sedimentation pond is presented on the Mine <br />Facilities Map (Map 12). The design plans and specifications for the <br />sedimentation pond are presented in Section 2.05.6. The sedimentation <br />pond will be located as close as practical to the area being disturbed <br />by surface facilities. <br />MAR 0 4 1986 <br />4.05-5 <br />