Laserfiche WebLink
• 13-8 <br />13-9 <br />13-9A <br />13-10 <br />13-11 <br />Rock Checkdam Design <br />Stock Tank Design <br />Stock Pond Stability Analysis <br />Shrub Establishment Studies <br />CSU/DMG Permanent Shrub Plots <br />13-12 Postmine Permanent Features <br />1312a Landowner Requests Tor Permanent Features <br />13-13 Vegetation Evaluation Procedures for Testing Reclamation Adequacy for Phase III Bond Release <br />13-14 Weed Management Plan <br /> LIST OF EXHIBITS <br /> Exhibit No. <br /> 13-1 Postmining Vegetation Map <br /> 13-2 8ackfill and Grading Schedule <br /> 132A Postmining Topography and Permanent Features <br /> 13-28 Permanent Roatl Cross-Sections <br /> 13-3 Revegetation Sample Site Locations (1980 Revegetation Report) <br />• 13-4 <br />13 <br />5 Proposed Pertnii Map <br />di <br />II B <br />S <br /> - eneca <br />on <br />ng <br /> 13-6 One-Half Mile Adjacent Vegetation Study Area <br /> 13-7 Postmining Vegetation Map -Pond 008/East Wadge EMension Area <br /> 13-8 Postmining Vegetation Map -North Wadge Deadhead Route <br /> f 3-9.74 Temporary Stocktank T-4 As-Built <br /> 13-9.78 Temporary Stocktank T-8 As-Bulk <br /> 139.716 Stock Pond T-16 As-Built <br /> 13-9.717 Stock Pond T-17 As-BUift <br /> 13-9.720 Stock Pond T-20 As-built <br /> 13-9.726 Stock Pond T-26 As-Built <br /> 139.728 Stock Pond T-28 As-Built <br /> 13-9.729 Stock Pond T-29 As-Built <br /> 13-9.730 Stock Pond T-30 As-BuiH <br /> 13-9.731 Stock Pond T-31 As-Built <br /> 139.732 Stock Pond T-32 As-Built <br /> 13-9.733 Stock Pond T-33 As-Built <br />• Map to Appendix 13-3 Sampling Area 1977-1983 Reclamation <br />MR-53 v Revised 12/05 <br />