My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101330
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:39 PM
Creation date
11/24/2007 7:47:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999098
IBM Index Class Name
Permit File
Doc Date
12/8/1999
Doc Name
PN M-99-098
From
CITY OF GREELEY
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />excellent examples and statistical information regazding "habitat" type reclamation. <br />Revegetation plans should include appropriate herbaceous perennials in the grass seed mixture. <br />Trees and shrubs selected for the site should primarily consist of native species, not ornamental <br />varieties. Perhaps existing trees and shrubs of appropriate size could be harvested into an on-site <br />nursery or moved into azeas being reclaimed. It is strongly suggested that habitat restoration and <br />revegetation efforts be planned and monitored by a qualified wildlife biologist/ecologist -not an <br />engineer or landscape architect. <br />IMPACTS TO NEIGHBORING PROPERTIES IN THE CITY LIMITS: There may be dust and <br />noise impacts to City residents to the south of the site at Poudre River Ranch. This area is <br />currently being developed (no longer "vacant" as indicated in application). The "views" being <br />mazketed by the developer for the residential azea will be highly disturbed during the 13 to 20 <br />yeaz mining cycle. Citizens have expressed concern over noise from dewatering pumps in <br />particulaz. <br />POUDRE RIVER TRAIL: There is a 100' foot easement shown for the trail in the area of Cel! 1. <br />This is adequate for the trail purposes. Reference to this easement needs to be included in <br />the written text of the permit application, not just on the reclamation map. It needs to be pointed <br />out that construction of [his section of trail is expected to take place prior to mining activities in <br />Cell 1. (Projected completion is June of 2000). The proposed conveyor will cross the trail in two <br />locations. Any safety or security measures needed by the mining activities will be the <br />responsibility of the mining operators, not the City, County or trail organization. Conversations <br />with CAMAS representatives have indicated this is acceptable to them and that they will not <br />interfere with the use of the trail by the public. An agreement may be appropriate. <br />If you have any questions regarding these comments, please call me at (970) 350-9783. I would <br />also like to be informed of hearing dates. <br />Sincere y, <br />~lil2v~ <br />Kazen Scopel <br />Natural Resources Planner <br />
The URL can be used to link to this page
Your browser does not support the video tag.