Laserfiche WebLink
<br />AREA E3 (1.82 ACRES): <br />Location: East of the south end of Area E2. <br />Condition: This appears to be an area where soil was stripped several <br />years ago in preparation for mining. The area was never mined. Vegetation <br />cover is moderate as a result of invasion. Contains one linear soil stockpile <br />near the east end of the area (volume = 780 yd ). <br />Future Reclamation: Would eventually become part of the sand extraction <br />plan for this area. <br />Current Reclamation: Push the soil stockpile westward to replace the <br />soil that was removed. <br />Disturbance Reduction Program: Included. See Current Reclamation. <br />AREA E9 (17.33 ACRES): <br />Location: A large excavation area in the center of this parcel of land <br />north of the irrigation ditch. <br />Condition: Contains one excavation that is approximately 90 feet deep <br />with near vertical side walls, except for the entrance road. Other <br />excavations are larger in area but much less in depth. This area represents <br />the rtwthod of extraction described in the 1985 amendment and is consistent <br />with the plan. The total volume of topsoil and overburden stockpiled in this <br />area is 33,950 yd . <br />Future Reclamation: Is part of the overall pit excavation. <br />Current Reclamation: Reduce vertical slopes to not steeper than 2.5:1 <br />through cut and fill. Replace topsoil and revegetate. <br />Disturbance Reduction Program: Not included. <br />AREA ES (1.58 ACRES): <br />Location: Southwest of Area E9 and immediately north of the irrigation <br />ditch. <br />Condition: A small excavatio3 containing all original topsoil and <br />overburden (total volume = 2,075 yd ). <br />Future Reclamation: Would become part of overall reclamation plan for <br />pit area. <br />Current Reclamation: GYade steep slopes, replace overburden and topsoil, <br />and revegetate. <br />Disturbance Reduction Program: Included. Plan is basically like <br />current reclamation. <br />AREA E6 (9.3 ACRES): <br />Location: Irtmediately south of Area E9, east of E5, and north of the <br />irrigation ditch. <br />Condition: 3No excavations. Stripped of soil and overburden (total <br />volume = 2,800 yd ). <br />Future Reclamation: Would become part of overall reclamation plan for <br />pit area. <br />Current Reclamation: Replace soil stockpiled on the south side of this <br />area and revegetate. <br />Disturbance Reduction Program: Included. Flan is like current <br />reclamation. <br />Page 12 Bonding Information M-73-007/M-77-213 January 7, 1992 <br />