My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101281
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:38 PM
Creation date
11/24/2007 7:45:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 40 E SEAM ACCESS AND DEVELOPMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a~cnartl D. Lamm <br />Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />Davitl H. Getcnes. Execu~rve Director <br />MINED LAND RECLAMATION DI\ <br />DAVID C. SHELTO N, Direotor <br />DATE: August 8, 1986 <br />T0: Gregg Squi r/e~ <br />FROM: Dale Plume \ `J~ <br />RE: FINDINGS OF RESPONSE TO STIPULATION NO. 1 REQUEST FROM EMPIRE ENERGY <br />"E" SEAM DEVELOPMENT WORK <br />Explanation of Findings <br />Pursuant to Rule 2.07.6(2)...Rule 2.07.6(2)(m) are discussed under the <br />appropriate discipline subtitle, compliance is required as per Rule 4,05 for <br />the Hydrologic Balance: Ground Water - Pule 2.04.5, 2.04.7, 2.05.3(4) and <br />4.05.10, 11 and 12 <br />The Stipulation is as follows: <br />STIPULATION N0. 1 <br />• PRIOR TO ANY REMOVAL OF COAL AS A RESULT OF DEVELOPMENT WORK IN THE "E" SEAM, <br />EMPIRE ENERGY MUST P.ECEIVE THE APPROVAL OF THE MINEC LAND RELLAJMTION DIVISION <br />FOR EMPIRE'S PLAN TO MONITOR ANY DECREASES IN THE GROUND WATER INFLOW RATE <br />INTO THE N0. 5 MINE DIRECTLY ABOVE AND CONTIGUOUS TO THE HORIZONTAL AREA <br />REPP,ESENTING THE MINE AREA FOR THE N0. 6 ttINE DEVELOPEMT 4(ORK. <br />THIS INFLOW SHALL BE MEASURED ON A REGULAR BASIS (TO BE AGREED UPON BY <br />DISCUSSION WITH MINED LAND RECLAMATION DIVISION REPRESENTATIVE) PRIOR TO N0. 6 <br />MINE DEVELOPMENT WORK AND DURING DEVELOPMENT iJORK. IF IT CAN BE DEMONSTRATED <br />THAT NO SIGNIFICANT INFLOW EXISTS, THIS STIPULATION WILL BE ELIMINATED. <br />Empire Energy requests that this stipulation be eliminated due to the <br />following facts: <br />1. The 1986 No. 5 Mine Inflow Study, performed ,tune 19, 1986, showed there <br />is no measurable inflow within 500 feet of the portion of the No. 5 dine <br />overlaying the planned "E" coal seam access and development area. <br />2. The expected .total inflow to the "E" coal seam access and development <br />area is 7.0 gpm. This volume amount is too small to try and detect by <br />measuring changes in the total inflow to the No. 5 Mine, which produces <br />600 to 700 gpm. <br />3. Since the "E" coal seam access and development area is in the vicinity of <br />the subcrop of the "E" coal seam, as well as the subcrop of the "F" coal <br />. seam, it is expected that both seams are unsaturated in most of the area <br />approved for the "E" coal seam access and development. Zero dewatering <br />will occur in areas where the No. 5 i4ine is unsaturated. <br />423 Centennial Building, 13t 3 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.