Laserfiche WebLink
DAILY DIARY <br />PROJECT Empire Energy DATE g/18/86 <br />LOCATION Craig, Colorado REPORT NO. Z TIME 3 hours <br />CLIENT Duran & Pierce Contractors ENGINEER/TECHNICIAN R.R. <br />WORN PERFORMED <br />The contractor moistened and recompacted the bedding and surrounding soils for <br />the culvert north of the ventilating system at the proposed waste area. We <br />conducted density tests of the recompacted fills. <br />ARKS <br />All three tests taken indicate that the compacted fill met or exceeded the <br />minimum requirement of 95z standard Proctor density. <br />VERBAL DISCUSSIONS <br />This information was given to Harry Elkin and completes our testing of the <br />culvert fills. <br />PROJECT NO. 86-992 <br />