My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101196
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101196
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:34 PM
Creation date
11/24/2007 7:41:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001022
IBM Index Class Name
Permit File
Doc Date
3/26/2001
Doc Name
WELD CNTY REFERRAL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i~s and Gesso, LLC <br />in accordance with Exhibit E. The initial mining in Cells 1 and 2 will create the <br />ponds at the western area of the property for use as process water and fresh <br />water ponds. Cell 2 will be subdivided into a fines settling area and an active <br />excavation area using a temporary dike, as shown in Exhibit C-3. Areas adjacent <br />to and in the northern portion of Cell 2 will be used for de-watering ditches, <br />sediment and sump areas, and setting the pumping systems. Subsequent <br />mining of Cell 2 will progress eastward during Phase 1. Mining to a 0.5 to 1 <br />gradient will occur in Cell 2. Concurrent slope backfill will occur as soon as <br />mining limits have been reached. This will allow concurrent backfill of the <br />perimeter while overburden is being stripped during the next phase. <br />Ditch flows will be corrected during Phase 1, directing the flows down a new <br />tailwater ditch created along the eastern property line. Improper maintenance of <br />irrigation ditches has artificially created some wetlands indicators on the property. <br />A ditch will also be constructed along the northern property line to provide a route <br />for discharge flows from de-watering operations. <br />Phase 2 (Years 2 through 51 <br />Mining will continue eastward in Cell 2. Topsoil and overburden will be stripped <br />and placed as previously described on page 7. A de-watering system will be <br />constructed to allow dry-mining of the new areas. Some non-wetland areas <br />south of Cell 3 will be utilized for concurrent wetland mitigation. <br />Phase 3 (Year 5 through 12) <br />Mining and concurrent reclamation will continue into Cells 3 and 4. Anew de- <br />watering system will be constructed - by moving pumps and other equipment <br />from areas such as Cell 2 or 3, where resource recovery has been completed - to <br />allow continued dry-mining. As with other phases, concurrent backfilling in Cells <br />3 and 4 brings slopes to a 3:1 ratio as soon as gravel has been fully recovered. <br />GreeNCroissant Property Santl and Gravel Mine.CDMG.112 Permit 20023 <br />Loveland Ready Mix Concrete, Inc. ~ 0 March 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.