Laserfiche WebLink
8E 5N Monitoring We1T <br />• Purpose: (1) Compliance with the following stipulation attached to <br />the Orchard Valley Mine Plan by the Colorado tdined Land <br />Reclamation Division. <br />The operator shall install and begin monitoring one <br />monitoring well located over the panel to be monitored <br />for subsidence one year prior to mining this panel. The <br />hole shall be completed in the stratum overlying the "D" <br />seam. !,'ater levels in this well shall be rr~nitored <br />monthly as weather permits, and water quality samples <br />shall be drawn twice per year for the parameters listed <br />in Appendix A of this findings document. The operator <br />shall submit to the Division a well completion report, <br />monitoring schedule, ground water level data and water <br />quality data prior to mining this panel. <br />• Procedure: <br />(1) Monthly measure water levels. <br />(2} Draw water sample twice/year. <br />(3j Test water samples for attached parameters. <br />(4) Log reports and keep program documented for inspection <br />by regulatory agency. <br /> <br />