Laserfiche WebLink
sum of costs facil rgrd <br />. COLOWYO COAL COMPANY REVISED FEBRUARY 15, 2001 <br />2000 MID TERM REVIEW - TR • 51 <br />FACILITIES REGRADE COSTS <br />SUMMARY OF COSTS <br />• <br />• <br /> Loose Bank Hours Cost Total <br /> Yards Yards by Equip per Hour Cost <br />Equipment by Areas (Ley) (Bry) (hours) (5/hr.) (5) <br />FariliUes Grading and Rlpping <br />D10N 1,025,789 820,615 642 5168.27 5141,727 <br />Asphalt Removal <br />777 Haul Trurhs 12,691 10,153 100.8 159 E1fi,069.80 <br />992C Loader 16 184 52,956.59 <br />D10N 6.1 16B 51,366.7fi <br />Summary of Fnuloment by Tvee <br />777 HaulTmcks <br />12,691 <br />10,153 <br />100.6 <br />159 516,069.60 <br />992C Loatler 12,691 10,153 16 5184.32 52,957 <br />D10N 1,038,461 630,768 850 5188.27 5143,094 <br />Suhtalal Fadlilles Grading and R1ppi 1,063,843 651,074 967 5162.120 <br />r1 7 7 <br />