Laserfiche WebLink
topsoil grading-sum cost <br />• COLOWYO COAL COMPANY <br />2000 MID TERM REVIEW - TR - 51 <br />TOPSOIL GRADING COSTS <br />SUMMARY OF COSTS <br />Loose Bank <br />Yards Yards <br />Equipment by Areas (Lq) <br />Motor <br />rader (Bq) <br />o <br />East Pit Summary <br />14G Matorgratler 1,566,168 1,383,024 <br />West Pit Summary <br />14G Motorgrader 7,333,419 7,159,495 <br />Section 16 PIl Summary <br />14G Motorgrader 426,845 370,998 <br />Facili8es Area Summary <br />14G Motorgrader 846,476 736,066 <br />Total Topsoil Grading <br />14G Motorgrader <br />• <br />REVISED FEBRUARY 15. 2001 <br />Hours Cosl Total <br />by Equip per Hour Cost <br />(hours) (S/hr.) (5) <br />932 559.80 555,707 <br />797 559.60 547,833 <br />451 559.80 f28,978 <br />420 559.80 525,126 <br />4,174,706 3,630,181 2,599 559.60 5155,445 <br />^1 r C" <br />