My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101108
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:31 PM
Creation date
11/24/2007 7:37:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059A
IBM Index Class Name
Permit File
Doc Date
4/24/2006
Section_Exhibit Name
Exhibit 10 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 010 <br />Date : 02/12!2008 <br />User: JRS <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Permit or other job action :2006 Midterm Review <br />Task description : Bac~ll Sediment and Dugout Ponds <br />NOURLY EQUIPMENT COST <br />Utilization % <br />351.01 NA <br />$93.55 100 <br />$0.00 0 <br />$31.78 NA <br />$176.34 Total fleet cosf/h <br />Loose <br />1.125 volume : 2,447 <br /> <br /> <br /> <br /> <br /> our <br />76.34 <br />LCY <br />Source of estimated volume :Map 7 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condkion Correction Factors Source <br />Average push distance : 85 feet <br />Unadjusted houriy production : 1,752.8 LCY/hr <br />Material consistency description <br />Compacted Rll or embankment <br />Average push gradient : 2.00 % (neg) <br />Average site aRitude : 5,800 feet <br />Material weight : 2, 850 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% EaRh <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost ; $0.247 /LCY <br />State :Colorado <br />County :Delta <br />Site :Terror C2ek Loadout <br />Basic machine : Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. t : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Operetor skill : 0.75 ', <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.05 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net conection : 0.41 <br />Adjusted unit production : 713.15 LCY/hr <br />Adjusted fleet production : 713.15 LCYmr <br />Total job lima : 3.43 Hours <br />Total job cost : 3605 <br />Perm~ob# : C-1983-059 <br />Abbreviation :none <br />Filename : C059-010 <br />Data source : (CRGJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.