Laserfiche WebLink
<br />itoADagt_E EQUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br />Roadabie Radable Average travel speed <br />Haul time (hours) = 1.00 <br />Retum time (hours) = 1.00 <br />Loading time (hours) = 2.50 <br />Unloading time (hours) = 2.50 <br />1.00 Total non-roadable mob/demob cost' <br />1.00 • nap rrn,nd 6tpa vriM haul rig <br />NA Total roadable mob/demob cost " <br />NA "one nwM trio. ~ haul rip <br />Subtotals = 7.00 <br />2.00 <br />Delta <br />40.0 miles <br />40.0 mph <br />$12,380.81 <br />$0.00 <br />JOB TIME AND COST Total job time : 14.00 hours <br />Total iob cost : 512.381 <br />EQUIPMENT HAUL DISTANCE and TIME <br />