Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Sokware <br />TRUCK/LOADER TEAM WORK <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 001 State :Colorado PermiUjob # : C-80-007 <br />Date: 08109/2006 County:Gunnison Abbreviation :none <br />User : TAK Site :West Elk Mine Filename :0007-001 <br />Permit or other job action :Permit Renewal RN-OS <br />Task description :BacMill portal bench to final contours <br />HOURLY EQUIPMENT COST Shift basis : ~~~ 1 per day ~~~~~ <br />D9R-9SU <br />D9R-9SU <br />TmcWloader team -Truck : Genedc f0-12 cy, 6x4 <br />-Loader :CAT 966G (2002) <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : rucWLOad <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader ~ Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />%Utilization-machine: 100 55 100 100 NA NA <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownership cosUhour: $11.86 $29.75 $64.72 $64.72 NA NA <br />Operating cesVhour: $41.22 $21.02 $98.84 $98.84 NA NA <br />Ripper op. wst/hour : NA NA $0.00 $0.00 NA NA <br />Operator cosUhour : $21.75 $32.78 $32.78 $32.78 NA NA <br />Unit subtotals : $74.83 $83.55 $196.34 $196.34 NA NA <br />Number of units : 6 1 1 1 0 0 <br />Group subtotals : Work : $532.50 Support : $392.68 Maintenance : $0.00 <br />Total work team wsVhour : $925.18 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 8,723 BCY factor: 1.330 volume: 11,602 LCY <br />Source of quantity take-off :Permit Volume 3, Exhibit 14; Pemrit Volume 11, Exhibit 54 <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck CaoaciN <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,900 pounds/LCY Struck volume : 10.00 LCY <br />Descr.: Decomposed rock - 50% Rock, 50% Earth Heaped volume : 12.00 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity : 12.21 LCY Adjusted volume': 12.00 LCY <br />Final track volume based on number of loader passes : 8.55 LCY <br />' imG volume atljusletl to nol exce atl rated payload or heaped volume <br />Loading Tool CaoaciN : ob Condition Corrections : Site altitude (ft.) : 6,300 <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader Source <br />Descr.:Other-soil, boulders, roots (80-100%) Altitude adj.: 1.000 0.920 (Cat HB) <br />Bucket fill factor : 0.900 Job efficiency : 0.830 0.830 (1 shiNday) <br />Adjusted bucket capacity : 4.275 LCY Net correction : 0.830 0.784 <br />