Laserfiche WebLink
CfRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />sheet 1 of 2 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 041 State :Colorado PermiUjob # : C-80-007 <br />Date : 09/18/2006 County :Gunnison Abbreviation :none <br />User : TAK Site :West Elk Mine Filename :0007-041 <br />Permit or otherjob action :Permit Renewal RN-05 <br />Task description :Coves refuse pile with subsoil <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />team -Truck :~Genenc f0-12 cy, 6z4 <br />Support equipment -Load area :Cat D9R - 9SU <br />-Dump area : Ca[ D9R - 9SU <br />Road maintenance -Motor grader : NA <br />-Water fruck : NA <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loatling Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />%Utilization-machine: 90 100 100 100 NA NA <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownership cost hour : $11.86 $29.75 $64.72 $64.72 NA NA <br />Operating cosUhour: $37.07 $38.33 $98.84 $98.84 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cosUhour: $21.75 $32.78 $32.78 $32.78 NA NA <br />Unit subtotals: $70.68 $100.85 $196.34 $196.34 NA NA <br />Number of units : 3 1 1 1 0 0 <br />Group subtotals : Work : $312.89 Support : $392.88 Maintenance : $0.00 <br />Total work team cosUhour : $705.57 <br />MATERIAL QUANTITIES ~~ <br />Initial Swell Loose <br />volume: 27,800 LCY factor: NA volume: 27,800 LCY <br />Source d quantity take-off :Permit Volume 7, Astyp 5>, TatrA° 47,~ RfR f f0 <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />.: .,:: ..,:. ....... ,.....ass <br />HOURLY PRODUCTION <br />Truck Capacity <br />I Basis : Truck Bed (volume) Basis <br />weight: 2,550 pounds/LCY <br />Descr.: Earth -Dry packed Heaped volume <br />Rated payload : 35,400 pounds Average volume <br />Payload capacity : 13.88 LCY Adjusted volume': <br /> Final truck volume based on number of loader passes <br /> 'track volume adjusted to not exce ed rated payload or heaped volume <br />Loading Tool CaoaciN : Job Condition Corre lions <br />Rated capacity (nom. heaped) : 4.750 LCY Truck <br />Descr.: Other -soil, boulders, roots (80 -100%) Altitude adj, : 1.000 <br />Bucket fill factor : 0.900 Job efficiency : 0.830 <br />Adjusted bucket capacity : 4.275 LCY Net correction : 0.830 <br />10.00 LCY <br />12.00 LCY <br />11.00 LCY <br />12.00 LCY <br />8.55 LCY <br />Site altitude (ft.) <br />Loader <br />0.830 <br />0.764 <br />