Laserfiche WebLink
sheet 1 of 2 <br /> CIRCES Cost Estimating Sokware <br /> TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 040 State :Colorado PermiVjob # : C-80-007 <br />Date: 09/18/2006 County:Gunnison Abbreviation :none <br />User : TAK Site :West Elk Mine Filename :0007-040 <br />Permit or other job action :Permit Renewal RN-OS <br />Task description :Topsoil all disturbed areas <br />HOURLY EQUIPMENT COST ~ Shift basis : ~~ 1 per day ~~~ <br />Truck/loader team -Truck :Generic 11 <br />-Loader :CAT 966C- <br />Support equipment -Load area :Cat D9R - <br />-Dump area :Cat D9R - <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />Utilization-machine : 100 94 100 100 NA NA <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownership wsVhour: $11.86 $29.75 $64.72 $64.72 NA NA <br />Operating cosVhour : $41.22 $36.19 $98.84 $98.84 NA NA <br />Ripper op. cosUhour: NA NA $0.00 $0.00 NA NA <br />Operator cesVhour : $21.75 $32.78 $32.78 $32.78 NA NA <br />Unit subtotals: $74.83 $98.72 $196.34 $196.34 NA NA <br />Number of units : 6 1 1 1 0 0 <br />Group subtotals : Work : $54767 Support : $392.68 Maintenance : $0.00 <br />Total work team cosUhour : $940.35 <br />MATERIAL QUANTITIES <br />Initial Swell loose <br />volume: 104,000 CCY factor: 1.125 volume: 117,000 LCY <br />Material weight : 2,550 pounds/LCY Struck volume <br />Descr.: Earth -Dry packed Heaped volume <br />Rated payload : 35,400 pounds Average volume <br />Payload capacity : 13.88 LCY Adjusted volume`: <br />Final truck volume based on number of loader passes <br />' Vuck volume atllustetl to not axceetl raletl payloatl or heapetl volume <br />Loading Tool Capacity : I JOb Condition Correctioi <br />Rated capacity (nom. heaped) : 4.750 LCY Truck <br />Descr.:Other- soil, boulders, roots (80 -100%) Altitude adj.: 1.000 <br />Bucket fill factor : 0.900 Job efficiency : 0.830 <br />Adjusted bucket capacity : 4.275 LCY Net correction : 0.830 <br />luuu Lor <br />12.00 LCY <br />11.00 LCY <br />12.00 LCY <br />8.55 LCY <br />Site altitude (R.) : 6,300 <br />Loader Source <br />0.920 (Cat HB <br />0.830 (user) <br />0.764 <br />