My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101074
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:30 PM
Creation date
11/24/2007 7:33:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 030 State : Colorado PermiUjob# <br />Date : 09/062006 County : Gunnison _ Abbreviation <br />User : TAK Site : West Elk Mine Filename <br /> <br />Agency or organization name <br />Permit or other job action <br />Task description <br />-- - --~- <br />HOURLY EQUIPMENT COST <br />c-8aoo7 <br />none <br />0007-030 <br />Colorado Division Of Mining, Reclamation And Safety <br />Permit Renewal RN-05 <br />Regrade Pond MB-2R <br />Basic machine <br />Blatle type <br />Attachmentno.l <br />Attachment no. 2 <br />Cat D9R - 9SU (2005) Horsepower : 405 <br />Semi-Universal <br />ROPS Cab <br />3-shank ripper-- <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cost hour : $72.92 _ NA <br /> Operating cosUhour : $98.84 100 <br /> Ripper op. cost hour : $0.00 0 <br /> Operator cosVhour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 28,733 CCY factor: 1.165 volume: 31,144 LCY <br />Source of estimated volume :Permit Volume 8A, Exhibit 66 _ <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 5.00 % (pos) <br />Average site altitude : 6,300 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Job Condition Correction Factors Source <br />Operator skill : _ 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : _ 1.00 _ (avg.) <br />Job efficiency: 0.83 (lshifl/day) <br />Spoil pile : 0.80 (fnd-rfJ <br />Push gradient : 0.90 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.32 <br />Decomposed rock - 50% Rock, 50% Earth _ _ Adjusted unit production : 292.33 LCY/hr <br /> Adjusted fleet production : 1,169.33 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 26.63 Hours <br />Unit cost : $0.700 /LCY Total job cost : $21,790 <br />---- <br />
The URL can be used to link to this page
Your browser does not support the video tag.