My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101074
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:30 PM
Creation date
11/24/2007 7:33:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimation Software <br />PROJECT IDENTIFICATION <br />Task # : 022 State :Colorado Permitlob # : C-80-007 <br />Date : 09/27/2006 County :Gunnison Abbreviation :none <br />User : TAK Site :West Elk Mine Filename :0007-022 <br />Agency or organization name :Colorado Division Of Rectamatron, Minrng And Safety <br />Permit or otherjob action :Permit Renewal RN-05 <br />Task description :Regiade Stacker Tube Access Road <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 330C L Horsepower : 244 <br /> Weight (MT} : 33.72 <br />Cost Breakdown : ~ Utilization <br />Ownership cosUhour : $46.31 NA Shif[ basis : 1 perday <br />Operating cosUhour : $58.15 100 Data source : {CRG) <br />Operatorcost/hour: $32.96 NA <br />Total unit cosUhour : $137.42 Total fleet cosUhour : $137.42 <br />:; .. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,880 CCY factor : 1.165 volume : 3,355 LCY <br />Source of estimated volume :Map 53 <br />Source of estimated swell factor :CAT Handbook <br />NOURLYPRODUCTION <br />Exravafor Cvcle lime (load bucket. swing loaded, dumo bucket, swing empt <br />Basic job condition description : BELOW AVERAGE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.39 minutes <br />Bucket Capacity <br />Rated bucket capacity : 2.25 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%l <br />Adjusted bucket capacity : 1.91 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,300 feet Altitude adjustment : 1.00 I {Cat Ht3) <br />Job efficiency adjustment : 0.83 (1 shitUday) <br />Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 294.23 LCYlhour <br />Adjusted hourly unit production : 244.21 LCY/hour <br />Adjusted hourly fleet production : 244.21 LCY/hour <br />JOB 71ME AND COST <br />Fleet size : 1 excavator(s) Total job time : 13.74 hours <br />Unit cost : $0.563 per LCY Total job cost : $1,888 <br />
The URL can be used to link to this page
Your browser does not support the video tag.