Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 017 <br />Date : 09/27/2006 <br />User : TAK <br />State : Colomdo <br />County :Gunnison <br />Site :West Elk Mine <br />PermiUjob # : C-80-007 <br />Abbreviation :none <br />Filename :0007-017 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal RN-05 <br />Task description :Rip stockpile area at Stackar Tubes and Reclaim System <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Dozer operating cosUhour : $98.84 100 <br />Ripper operating cost/hour : $751 100 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $212.05 Total Fleet cost/hour : $84$.19 <br />MATERIAL QUANTITIES <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 6.50 acres Rip depth (ft) 2.00 Volume : 20,973 BCY or CCY <br /> <br />Source of estimated quantity :TR-58; Map 53 <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feeUsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2, 702.54 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feetpass Site altitude : 6,300 feet <br />Average ripping width : 7.67 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 200.00 feeUpass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feeVminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.838 acres hour Adjusted unit production : 2,243.11 cu. yds./hour <br />Unadjusted production : 2,702.54 cu. yds./hour Adjusted fleet production : 8,972.44 cu. yds./hour <br /> <br />JOB TIME AND COST <br />~~~ ,. <br />~~ ~~ ~ <br />~~ ~~~ ~~ <br />- ~ ~ ~ : <br />~~~ ~~ - ~~~ <br />Fleet size : 4 dozers) Total job time : 2.34 hours <br />Unit cost : $0.095 per cu. yd. Total job cost : $1,983 <br />